BT Compund Lighting Bhutan Telecom Ltd Contract Awarded
Procurement Category: Services
Dzongkhag/Location: Chukha
Goods/Services/Work Type: Supply. installation and commissioning
Procurement Method: Open Tendering
Annual Procurement Plan: 2020
Bidding Process: Single Stage Bidding - Single Envelope
Contact Details: Karma.sherub@bt/bt
Status: Contract Awarded
Bidding Details
Submission Date: February 04 2020, 11:00 AM
Opening Date: February 04 2020, 02:00 PM
Prebid Date: None
Prebid Place: None
Earnest Money Deposit Details
EMD Type: Percent
EMD Value: 2.0%
Evaluation Details
Financial Evaluation: 100%
Agency Documents
Sl | Document | Link |
---|---|---|
1 | Integrity Pact Document | Download |
2 | RFP | Download |
Document Prerequisites For Participation
Sl | Document |
---|---|
2 | Integrity Pact Document |
4 | Tax Clearance |
5 | Trade License |
Tender Items(BOQ/BOM)
Sl | Item Code | Item Name, Additional Description/Specifications |
UoM | Qty |
---|---|---|---|---|
1 | Item Lot | |||
2 | FA00001 | Lighting Poles (8 mtrs with bottom diameter of 5 inch and top diameter of 3 inch, GI (Hopt Dip Galvanize) pole in octagonal shape with single arm), | no | 18 |
3 | FA00002 | Power Cable ( 2 core,16sqmm armoured aluminium cable) (Make:RR Kabel/Polycab/ Havells/Finolex/ Rallison), | m | 200.0 |
4 | FA00004 | Power Cable (2 core, 6sqmm multi-strand copper cable. Make:RR Kabel/Polycab/ Havells/Finolex/ Rallison), | m | 200.0 |
5 | FA00003 | Polythene Pipe ( 3/4"), | m | 200.0 |
6 | FA00005 | Switch Box (Outdoor Switch box with 1 no. of MCB mountable with required screws, nut and bolts etc.), | no | 18 |
7 | FA00006 | MCB (6 Amps MCB ) (Make Havells/Schneider/Legrand/Anchor), | no | 18 |
8 | FA00007 | MCB (32 Amps) (Make :Havells/Schneider/Legrand/Anchor), | no | 4 |
9 | FA00008 | MCB Box ( 1 way), | no | 4 |
10 | FA00009 | LED Light ( 65Watts LED bulbs with enclosures/fixtures ) Standard make, | Set | 18.0 |
11 | SW00001 | Installation Cost , | no | 4 |
Amendment Details
Sl | ID | Date | Details | Remarks |
---|---|---|---|---|
1 | TAM20010006 | January 28 2020, 02:45 PM | Submission Date changed from 2020-01-28 11:00:00 to 2020-02-04 14:00:00 | Extension |
2 | TAM20020001 | February 04 2020, 01:52 PM | Opening Date changed from 2020-01-28 14:00:00 to 2020-02-04 12:00:00 | Opening Date Extension |