Shifting of 12m COMPLETE Tower from Tshenkharla to Sepdhung Bhutan Telecom Ltd Contract Awarded
Procurement Category: Civil
Dzongkhag/Location: Trashiyangtse
Goods/Services/Work Type: CON-W4-Power and Telecommunications Works (Small)
Procurement Method: Open Tendering
Annual Procurement Plan: 2020
Bidding Process: Single Stage Bidding - Single Envelope
Contact Details: Mrs.Cheki Wangmo Civil Engineer-BTL 17162638
Status: Contract Awarded
Bidding Details
Submission Date: February 28 2020, 12:00 PM
Opening Date: February 28 2020, 02:30 PM
Prebid Date: None
Prebid Place: None
Earnest Money Deposit Details
EMD Type: Lumpsum
EMD Value: Nu. 6,000.00/-
Evaluation Details
Financial Evaluation: 100%
Agency Documents
Sl | Document | Link |
---|---|---|
1 | RFP | Download |
Document Prerequisites For Participation
Sl | Document |
---|---|
1 | Bid Form |
2 | CDB License |
3 | Integrity Pact Document |
4 | Tax Clearance |
5 | Trade License |
Tender Items(BOQ/BOM)
Sl | Item Code | Item Name, Additional Description/Specifications |
UoM | Qty |
---|---|---|---|---|
1 | Construction | |||
2 | EW0106 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, | cu.m | 100.0 |
3 | CW0008 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size), | cu.m | 2.5 |
4 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 768.64 |
5 | RC0002 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), | cu.m | 15.68 |
6 | RC0090 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., | sq.m | 33.12 |
7 | EW0195 | Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, | cu.m | 17.22 |
8 | SW00016 | Dismatling ofTower Structure -as per site engineer, | Set | 1.0 |
9 | SW00010 | Transportation of Tower structure from Tshenkharla to Sepdung site, | Set | 1.0 |
10 | SW00011 | Erection of Tower structure-complete , | Set | 1.0 |
11 | SW00012 | Providing and Fitting of Nut and Bolt for Tower structure-as per site engineer, | Set | 1.0 |