Shifting of Solar Pannels and Structure from Barcopzor to Changshing Goenpa under Thangrong gewog,Monggar Dzongkhag Bhutan Telecom Ltd Contract Awarded
Procurement Category: Civil
Dzongkhag/Location: Mongar
Goods/Services/Work Type: CON-W4-Power and Telecommunications Works (Small)
Procurement Method: Open Tendering
Annual Procurement Plan: 2020
Bidding Process: Single Stage Bidding - Single Envelope
Contact Details: Mrs.Cheki Wangmo Civil Engineer-BTL 17162638
Status: Contract Awarded
Bidding Details
Submission Date: May 22 2020, 12:00 PM
Opening Date: May 22 2020, 02:30 PM
Prebid Date: None
Prebid Place: None
Earnest Money Deposit Details
EMD Type: Lumpsum
EMD Value: Nu. 3,500.00/-
Evaluation Details
Financial Evaluation: 100%
Agency Documents
Sl | Document | Link |
---|---|---|
2 | RFP | Download |
Document Prerequisites For Participation
Sl | Document |
---|---|
1 | Bid Form |
2 | CDB License |
3 | Integrity Pact Document |
4 | Tax Clearance |
5 | Trade License |
Tender Items(BOQ/BOM)
Sl | Item Code | Item Name, Additional Description/Specifications |
UoM | Qty |
---|---|---|---|---|
1 | Shifting of Solar | |||
2 | EW0021 | Earth work in surface excavation, depth <300mm, width >1.5m, area >10 Sq.m in plan, including disposal of excavated earth within 50m lead & 1.5m lift and disposed soil to be neatly dressed - Hard Soil, | sq.m | 19.5 |
3 | EW0106 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, | cu.m | 13.5 |
4 | CW0008 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size), | cu.m | 1.35 |
5 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 376.38 |
6 | RC0002 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), | cu.m | 4.61 |
7 | RC0090 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., | sq.m | 23.76 |
8 | EW0195 | Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, | cu.m | 0.24 |
9 | SW00020 | Dismatling of Solar Structure and Pannels-as per site engineer, | Set | 1.0 |
10 | SW00021 | Transportaion of solar structure and pannels from Barcopzor to Changshing goenpa -Complete Set, | Set | 1.0 |
11 | SW00022 | Fitting of solar structure and Pannel-complete set, | Set | 1.0 |
12 | SW00023 | Providing anfd fitting of Nut and Bolt for solar structure-as per site engineer, | Set | 1.0 |
Amendment Details
Sl | ID | Date | Details | Remarks |
---|---|---|---|---|
1 | TAM20040010 | April 21 2020, 02:39 PM | Submission Date changed from 2020-04-21 12:00:00 to 2020-05-15 12:00:00 | Regional tender Commitee decided to re-tender as there was no bidder.Decided to re-open on 15th may 2020. |
2 | TAM20040011 | April 21 2020, 02:39 PM | Opening Date changed from 2020-04-21 14:30:00 to 2020-05-15 14:30:00 | Regional tender Commitee decided to re-tender as there was no bidder.Decided to re-open on 15th may 2020. |
3 | TAM20050004 | May 15 2020, 02:37 PM | Submission Date changed from 2020-05-15 12:00:00 to 2020-05-22 12:00:00 | Regional Tender Commitee recommended to re-tender the bid as there were three bidder out of which one bidder haven't submitted the EMD and decided to re-opened on 22nd May 2020. |
4 | TAM20050005 | May 15 2020, 02:38 PM | Opening Date changed from 2020-05-15 14:30:00 to 2020-05-22 14:30:00 | Regional Tender Commitee recommended to re-tender the bid as there were three bidder out of which one bidder haven't submitted the EMD and decided to re-opened on 22nd May 2020. |