Construction of Solar Pillar Jampani Top under Jomotshangkha Dungkhag. Bhutan Telecom Ltd Draft


Procurement Category: Civil

Dzongkhag/Location: Samdrup Jongkhar

Goods/Services/Work Type: CON-W4-Power and Telecommunications Works (Small)

Procurement Method: Limited Tendering

Annual Procurement Plan: 2020

Bidding Process: Single Stage Bidding - Single Envelope

Contact Details: Cheki Wangmo Civil Engineer

Status: Draft


Bidding Details

Submission Date: September 07 2026, 12:00 AM

Opening Date: June 26 2020, 02:30 PM

Prebid Date: None

Prebid Place: None

Evaluation Details

Financial Evaluation: 100%

Tender Items(BOQ/BOM)


Sl Item Code Item Name,
Additional Description/Specifications
UoM Qty
1 Solar Pillar
2 EW0031 Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, cu.m 10.92
3 EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m 4.0
4 CW0008 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size), cu.m 0.25
5 RC0083 Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, kg 157.07
6 RC0002 Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), cu.m 1.08
7 RC0090 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., sq.m 12.6
8 EW0195 Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, cu.m 0.2
9 PI0012 Providing & fixing H.D.P.E pipes including clamps & repair walls etc. complete - 32mm, m 20.0
10 SW00065 Transportation of Solar Structure from Road point to Station., kg 148.61
11 SW00066 Transportation of Solar pannels from Road point to station, each 10.0