Construction of tower, shelter, fencing at Teyghithab and Khalabdo Bhutan Telecom Ltd Contract Awarded
Procurement Category: Civil
Dzongkhag/Location: Thimphu
Goods/Services/Work Type: CON-W4-Power and Telecommunications Works (Small)
Procurement Method: Open Tendering
Annual Procurement Plan: 2021
Bidding Process: Single Stage Bidding - Single Envelope
Contact Details: Sonam Zangpo 17123370
Status: Contract Awarded
Bidding Details
Submission Date: August 25 2021, 04:00 PM
Opening Date: August 26 2021, 02:00 PM
Prebid Date: None
Prebid Place: None
Earnest Money Deposit Details
EMD Type: Lumpsum
EMD Value: Nu. 46,500.00/-
Evaluation Details
Financial Evaluation: 100%
Agency Documents
Sl | Document | Link |
---|---|---|
4 | Integrity Pact Document | Download |
7 | RFP | Download |
9 | Bid Form | Download |
Document Prerequisites For Participation
Sl | Document |
---|---|
1 | Bid Form |
3 | CDB License |
6 | Integrity Pact Document |
9 | Tax Clearance |
10 | Trade License |
Tender Items(BOQ/BOM)
Sl | Item Code | Item Name, Additional Description/Specifications |
UoM | Qty |
---|---|---|---|---|
1 | tower | |||
2 | EW0030 | Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Ordinary Soil, | cu.m | 70.0 |
3 | CW0008 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size), | cu.m | 2.78 |
4 | RC0010 | Providing & laying in position reinforced cement concrete work in plinth and skirting courses, fillets, columns , pillars, posts and struts upto floor five level excluding the cost of centering, shuttering and reinforcement - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), | cu.m | 9.12 |
5 | EW0195 | Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, | cu.m | 48.0 |
6 | None | shelter, | - | - |
7 | EW0030 | Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Ordinary Soil, | cu.m | 28.0 |
8 | CW0008 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size), | cu.m | 1.64 |
9 | RC0010 | Providing & laying in position reinforced cement concrete work in plinth and skirting courses, fillets, columns , pillars, posts and struts upto floor five level excluding the cost of centering, shuttering and reinforcement - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), | cu.m | 6.32 |
10 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 1568.84 |
11 | EW0195 | Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, | cu.m | 40.0 |
12 | None | solar, | - | - |
13 | EW0031 | Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, | cu.m | 21.12 |
14 | EW0105 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil, | cu.m | 43.0 |
15 | CW0003 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, | cu.m | 3.2 |
16 | RC0090 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., | sq.m | 54.0 |
17 | SW00343 | Providing and Fixing of 65X65x6mm equal angle for support with complete Aluminium Paint, | each | 834.0 |
18 | SW00344 | P&F of flat to be welded in foundation with complete Paint, | nos | 128.0 |
19 | SW00345 | P& F of Nut and Bolts, | nos | 60.0 |
20 | None | fencing Barbed wire only for khalabdo, | - | - |
21 | EW0105 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil, | cu.m | 1.89 |
22 | CW0005 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 20 mm nominal size, | cu.m | 1.53 |
23 | SW0011 | Steel work riveted or bolted, in built up sections, trusses, frame-works, including cutting, hoisting, fixing and appl. priming coat of red lead paint - In Tees, angles and channels, | kg | 294.0 |
24 | RW0202 | Providing & fixing G.I barbed Wire Netting including fixing of post or struts, G.I staples, coal tarring in case of ballies complete (posts/struts, earthwork, concrete paid separately) - 2.5mm , (12 SWG), 4 barbs form by twisting two point wires, each two turns, pitch of barbs 75mm, | m | 2420.0 |
25 | RC0090 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., | sq.m | 20.4 |
26 | None | Gate, | - | - |
27 | EW0105 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil, | cu.m | 0.5 |
28 | SM0072 | Providing and laying Hand packed stone filling or soling with stones, | cu.m | 0.07 |
29 | RC0011 | Providing & laying in position reinforced cement concrete work in plinth and skirting courses, fillets, columns , pillars, posts and struts upto floor five level excluding the cost of centering, shuttering and reinforcement - 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20 mm nominal size), | cu.m | 0.82 |
30 | SW0011 | Steel work riveted or bolted, in built up sections, trusses, frame-works, including cutting, hoisting, fixing and appl. priming coat of red lead paint - In Tees, angles and channels, | kg | 34.38 |
31 | RC0090 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., | sq.m | 8.62 |
32 | PT0011 | Providing & applying one coat of primers - Metal work - synthetic red oxide primer, | sq.m | 56.52 |
33 | PT0055 | Providing and applying finishing coats - Aluminium paint, two coats on new work, | sq.m | 56.52 |
34 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 136.28 |
35 | EW0195 | Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, | cu.m | 0.07 |
36 | PL0021 | Providing & laying 12mm cement plaster - C.M 1:4, | sq.m | 6.0 |
Amendment Details
Sl | ID | Date | Details | Remarks |
---|---|---|---|---|
1 | TAM21080005 | August 09 2021, 08:56 AM | Tender Items(BOQ/BOM) changed from None to None | Added ms bar quantity of tower and shelter together. |
2 | TAM21080005 | August 09 2021, 08:56 AM | EW0030, Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Ordinary Soil changed from 70 to 0 | Added ms bar quantity of tower and shelter together. |
3 | TAM21080005 | August 09 2021, 08:56 AM | CW0008, Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size) changed from 2.78 to 0 | Added ms bar quantity of tower and shelter together. |
4 | TAM21080005 | August 09 2021, 08:56 AM | RC0010, Providing & laying in position reinforced cement concrete work in plinth and skirting courses, fillets, columns , pillars, posts and struts upto floor five level excluding the cost of centering, shuttering and reinforcement - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size) changed from 9.12 to 0 | Added ms bar quantity of tower and shelter together. |
5 | TAM21080005 | August 09 2021, 08:56 AM | EW0195, Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m changed from 48 to 0 | Added ms bar quantity of tower and shelter together. |
6 | TAM21080005 | August 09 2021, 08:56 AM | EW0030, Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Ordinary Soil changed from 28 to 0 | Added ms bar quantity of tower and shelter together. |
7 | TAM21080005 | August 09 2021, 08:56 AM | CW0008, Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size) changed from 1.64 to 0 | Added ms bar quantity of tower and shelter together. |
8 | TAM21080005 | August 09 2021, 08:56 AM | RC0010, Providing & laying in position reinforced cement concrete work in plinth and skirting courses, fillets, columns , pillars, posts and struts upto floor five level excluding the cost of centering, shuttering and reinforcement - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size) changed from 6.32 to 0 | Added ms bar quantity of tower and shelter together. |
9 | TAM21080005 | August 09 2021, 08:56 AM | RC0083, Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete changed from 774.84 to 1568.84 | Added ms bar quantity of tower and shelter together. |
10 | TAM21080005 | August 09 2021, 08:56 AM | EW0195, Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m changed from 40 to 0 | Added ms bar quantity of tower and shelter together. |
11 | TAM21080005 | August 09 2021, 08:56 AM | EW0031, Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil changed from 21.12 to 0 | Added ms bar quantity of tower and shelter together. |
12 | TAM21080005 | August 09 2021, 08:56 AM | EW0105, Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil changed from 43 to 0 | Added ms bar quantity of tower and shelter together. |
13 | TAM21080005 | August 09 2021, 08:56 AM | CW0003, Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size changed from 3.2 to 0 | Added ms bar quantity of tower and shelter together. |
14 | TAM21080005 | August 09 2021, 08:56 AM | RC0090, Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc. changed from 54 to 0 | Added ms bar quantity of tower and shelter together. |
15 | TAM21080005 | August 09 2021, 08:56 AM | SW00343, Providing and Fixing of 65X65x6mm equal angle for support with complete Aluminium Paint changed from 834 to 0 | Added ms bar quantity of tower and shelter together. |
16 | TAM21080005 | August 09 2021, 08:56 AM | SW00344, P&F of flat to be welded in foundation with complete Paint changed from 128 to 0 | Added ms bar quantity of tower and shelter together. |
17 | TAM21080005 | August 09 2021, 08:56 AM | SW00345, P& F of Nut and Bolts changed from 60 to 0 | Added ms bar quantity of tower and shelter together. |
18 | TAM21080005 | August 09 2021, 08:56 AM | EW0105, Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil changed from 1.89 to 0 | Added ms bar quantity of tower and shelter together. |
19 | TAM21080005 | August 09 2021, 08:56 AM | CW0005, Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 20 mm nominal size changed from 1.53 to 0 | Added ms bar quantity of tower and shelter together. |
20 | TAM21080005 | August 09 2021, 08:56 AM | SW0011, Steel work riveted or bolted, in built up sections, trusses, frame-works, including cutting, hoisting, fixing and appl. priming coat of red lead paint - In Tees, angles and channels changed from 294 to 0 | Added ms bar quantity of tower and shelter together. |
21 | TAM21080005 | August 09 2021, 08:56 AM | RW0202, Providing & fixing G.I barbed Wire Netting including fixing of post or struts, G.I staples, coal tarring in case of ballies complete (posts/struts, earthwork, concrete paid separately) - 2.5mm , (12 SWG), 4 barbs form by twisting two point wires, each two turns, pitch of barbs 75mm changed from 2420 to 0 | Added ms bar quantity of tower and shelter together. |
22 | TAM21080005 | August 09 2021, 08:56 AM | RC0090, Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc. changed from 20.4 to 0 | Added ms bar quantity of tower and shelter together. |
23 | TAM21080005 | August 09 2021, 08:56 AM | EW0105, Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil changed from 0.5 to 0 | Added ms bar quantity of tower and shelter together. |
24 | TAM21080005 | August 09 2021, 08:56 AM | SM0072, Providing and laying Hand packed stone filling or soling with stones changed from 0.08 to 0 | Added ms bar quantity of tower and shelter together. |
25 | TAM21080005 | August 09 2021, 08:56 AM | RC0011, Providing & laying in position reinforced cement concrete work in plinth and skirting courses, fillets, columns , pillars, posts and struts upto floor five level excluding the cost of centering, shuttering and reinforcement - 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20 mm nominal size) changed from 0.82 to 0 | Added ms bar quantity of tower and shelter together. |
26 | TAM21080005 | August 09 2021, 08:56 AM | SW0011, Steel work riveted or bolted, in built up sections, trusses, frame-works, including cutting, hoisting, fixing and appl. priming coat of red lead paint - In Tees, angles and channels changed from 34.38 to 0 | Added ms bar quantity of tower and shelter together. |
27 | TAM21080005 | August 09 2021, 08:56 AM | RC0090, Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc. changed from 8.62 to 0 | Added ms bar quantity of tower and shelter together. |
28 | TAM21080005 | August 09 2021, 08:56 AM | PT0011, Providing & applying one coat of primers - Metal work - synthetic red oxide primer changed from 56 to 0 | Added ms bar quantity of tower and shelter together. |
29 | TAM21080005 | August 09 2021, 08:56 AM | PT0055, Providing and applying finishing coats - Aluminium paint, two coats on new work changed from 56 to 0 | Added ms bar quantity of tower and shelter together. |
30 | TAM21080005 | August 09 2021, 08:56 AM | RC0083, Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete changed from 136.28 to 0 | Added ms bar quantity of tower and shelter together. |
31 | TAM21080005 | August 09 2021, 08:56 AM | EW0195, Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m changed from 0.07 to 0 | Added ms bar quantity of tower and shelter together. |
32 | TAM21080005 | August 09 2021, 08:56 AM | PL0021, Providing & laying 12mm cement plaster - C.M 1:4 changed from 6 to 0 | Added ms bar quantity of tower and shelter together. |
33 | TAM21080006 | August 09 2021, 09:07 AM | Tender Items(BOQ/BOM) changed from None to None | total ms bar of tower and shelter were added together. |
34 | TAM21080006 | August 09 2021, 09:07 AM | EW0030, Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Ordinary Soil changed from 0 to 70 | total ms bar of tower and shelter were added together. |
35 | TAM21080006 | August 09 2021, 09:07 AM | CW0008, Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size) changed from 0 to 2.78 | total ms bar of tower and shelter were added together. |
36 | TAM21080006 | August 09 2021, 09:07 AM | RC0010, Providing & laying in position reinforced cement concrete work in plinth and skirting courses, fillets, columns , pillars, posts and struts upto floor five level excluding the cost of centering, shuttering and reinforcement - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size) changed from 0 to 9.12 | total ms bar of tower and shelter were added together. |
37 | TAM21080006 | August 09 2021, 09:07 AM | EW0195, Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m changed from 0 to 48 | total ms bar of tower and shelter were added together. |
38 | TAM21080006 | August 09 2021, 09:07 AM | EW0030, Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Ordinary Soil changed from 0 to 28 | total ms bar of tower and shelter were added together. |
39 | TAM21080006 | August 09 2021, 09:07 AM | CW0008, Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size) changed from 0 to 1.64 | total ms bar of tower and shelter were added together. |
40 | TAM21080006 | August 09 2021, 09:07 AM | RC0010, Providing & laying in position reinforced cement concrete work in plinth and skirting courses, fillets, columns , pillars, posts and struts upto floor five level excluding the cost of centering, shuttering and reinforcement - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size) changed from 0 to 6.32 | total ms bar of tower and shelter were added together. |
41 | TAM21080006 | August 09 2021, 09:07 AM | EW0195, Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m changed from 0 to 40 | total ms bar of tower and shelter were added together. |
42 | TAM21080006 | August 09 2021, 09:07 AM | EW0031, Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil changed from 0 to 21.12 | total ms bar of tower and shelter were added together. |
43 | TAM21080006 | August 09 2021, 09:07 AM | EW0105, Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil changed from 0 to 43 | total ms bar of tower and shelter were added together. |
44 | TAM21080006 | August 09 2021, 09:07 AM | CW0003, Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size changed from 0 to 3.2 | total ms bar of tower and shelter were added together. |
45 | TAM21080006 | August 09 2021, 09:07 AM | RC0090, Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc. changed from 0 to 54 | total ms bar of tower and shelter were added together. |
46 | TAM21080006 | August 09 2021, 09:07 AM | SW00343, Providing and Fixing of 65X65x6mm equal angle for support with complete Aluminium Paint changed from 0 to 834 | total ms bar of tower and shelter were added together. |
47 | TAM21080006 | August 09 2021, 09:07 AM | SW00344, P&F of flat to be welded in foundation with complete Paint changed from 0 to 128 | total ms bar of tower and shelter were added together. |
48 | TAM21080006 | August 09 2021, 09:07 AM | SW00345, P& F of Nut and Bolts changed from 0 to 60 | total ms bar of tower and shelter were added together. |
49 | TAM21080006 | August 09 2021, 09:07 AM | EW0105, Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil changed from 0 to 1.89 | total ms bar of tower and shelter were added together. |
50 | TAM21080006 | August 09 2021, 09:07 AM | CW0005, Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 20 mm nominal size changed from 0 to 1.53 | total ms bar of tower and shelter were added together. |
51 | TAM21080006 | August 09 2021, 09:07 AM | SW0011, Steel work riveted or bolted, in built up sections, trusses, frame-works, including cutting, hoisting, fixing and appl. priming coat of red lead paint - In Tees, angles and channels changed from 0 to 294 | total ms bar of tower and shelter were added together. |
52 | TAM21080006 | August 09 2021, 09:07 AM | RW0202, Providing & fixing G.I barbed Wire Netting including fixing of post or struts, G.I staples, coal tarring in case of ballies complete (posts/struts, earthwork, concrete paid separately) - 2.5mm , (12 SWG), 4 barbs form by twisting two point wires, each two turns, pitch of barbs 75mm changed from 0 to 2420 | total ms bar of tower and shelter were added together. |
53 | TAM21080006 | August 09 2021, 09:07 AM | RC0090, Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc. changed from 0 to 20.4 | total ms bar of tower and shelter were added together. |
54 | TAM21080006 | August 09 2021, 09:07 AM | EW0105, Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil changed from 0 to 0.5 | total ms bar of tower and shelter were added together. |
55 | TAM21080006 | August 09 2021, 09:07 AM | SM0072, Providing and laying Hand packed stone filling or soling with stones changed from 0 to 0.07 | total ms bar of tower and shelter were added together. |
56 | TAM21080006 | August 09 2021, 09:07 AM | RC0011, Providing & laying in position reinforced cement concrete work in plinth and skirting courses, fillets, columns , pillars, posts and struts upto floor five level excluding the cost of centering, shuttering and reinforcement - 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20 mm nominal size) changed from 0 to 0.82 | total ms bar of tower and shelter were added together. |
57 | TAM21080006 | August 09 2021, 09:07 AM | SW0011, Steel work riveted or bolted, in built up sections, trusses, frame-works, including cutting, hoisting, fixing and appl. priming coat of red lead paint - In Tees, angles and channels changed from 0 to 34.38 | total ms bar of tower and shelter were added together. |
58 | TAM21080006 | August 09 2021, 09:07 AM | RC0090, Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc. changed from 0 to 8.62 | total ms bar of tower and shelter were added together. |
59 | TAM21080006 | August 09 2021, 09:07 AM | PT0011, Providing & applying one coat of primers - Metal work - synthetic red oxide primer changed from 0 to 56.52 | total ms bar of tower and shelter were added together. |
60 | TAM21080006 | August 09 2021, 09:07 AM | PT0055, Providing and applying finishing coats - Aluminium paint, two coats on new work changed from 0 to 56.52 | total ms bar of tower and shelter were added together. |
61 | TAM21080006 | August 09 2021, 09:07 AM | RC0083, Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete changed from 0 to 136.28 | total ms bar of tower and shelter were added together. |
62 | TAM21080006 | August 09 2021, 09:07 AM | EW0195, Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m changed from 0 to 0.07 | total ms bar of tower and shelter were added together. |
63 | TAM21080006 | August 09 2021, 09:07 AM | PL0021, Providing & laying 12mm cement plaster - C.M 1:4 changed from 0 to 6 | total ms bar of tower and shelter were added together. |
64 | TAM21080031 | August 19 2021, 02:48 PM | Opening Date changed from 2021-08-19 14:00:00 to 2021-08-26 14:00:00 | only 2 bidder. |
65 | TAM21080032 | August 19 2021, 02:49 PM | Submission Date changed from 2021-08-18 16:00:00 to 2021-08-25 16:00:00 | only 2 bidder participated |