Construction of DG shed and Platform Bhutan Telecom Ltd Cancelled
Procurement Category: Civil
Dzongkhag/Location: Sarpang
Goods/Services/Work Type: CON-W4-Power and Telecommunications Works (Small)
Procurement Method: Open Tendering
Annual Procurement Plan: 2022
Bidding Process: Single Stage Bidding - Single Envelope
Contact Details: Pema Wangdi (Mr.) Civil Engineering Section, Central Region, BTL. Tel: +975 2 343434 Ext. 6013 | Mob: +975 17141880| pema.wangdi2573@bt.bt Bhutan Telecom Ltd: www.bt.bt |
Status: Cancelled
Bidding Details
Submission Date: September 07 2026, 12:00 AM
Opening Date: March 31 2022, 02:00 PM
Prebid Date: None
Prebid Place: GElephu
Earnest Money Deposit Details
EMD Type: Lumpsum
EMD Value: Nu. 10,000.00/-
Evaluation Details
Financial Evaluation: 100%
Agency Documents
| Sl | Document | Link |
|---|---|---|
| 1 | RFP | Download |
| 2 | Bid Form | Download |
| 3 | Integrity Pact Document | Download |
| 4 | Drawings | Download |
Document Prerequisites For Participation
| Sl | Document |
|---|---|
| 2 | Bid Form |
| 6 | CDB License |
| 15 | Integrity Pact Document |
| 21 | Tax Clearance |
| 24 | Trade License |
Tender Items(BOQ/BOM)
| Sl | Item Code | Item Name, Additional Description/Specifications |
UoM | Qty |
|---|---|---|---|---|
| 1 | Construction of DG shed and platform at Domkhar | |||
| 2 | EW0031 | Excavation in foundation trenches or drains not exceeding 1.5m width or area 10 sq. m on plan, including dressing or ramming, disposal of surplus soil 5000m away for any lead and lifts-All kinds of soil. platform, | cu.m | 17.88 |
| 3 | CW0005 | Providing and laying in position plain cement concrete 1:3:6, 20mm nominal aggregates, excluding the cost of centering and shuttering -all work upto plinth level, | cu.m | 0.88 |
| 4 | SM0072 | Providing and laying Hand packed stone soling or filling with stones, | cu.m | 0.99 |
| 5 | CW0002 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth leve, | cu.m | 3.73 |
| 6 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete 12mm dia horizontal, | kg | 211.38 |
| 7 | EW0195 | Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, | cu.m | 1.5 |
| 8 | RC0090 | Providing and laying shuttering and centering (form work), including strutting, propping etc. and removal of form work. , | sq.m | 5.3 |
| 9 | SW0021 | Steel work riveted or bolted, in built up sections, trusses, frame-works, including cutting, hoisting, fixing and appl. priming etc, | kg | 422.27 |
| 10 | RF0001 | Providing & fixing CRIL (CGI) sheeting, including bolts, hooks and nuts 8mm dia. with bitumen and G.I limpet washers filled with white lead for connection, excluding the cost of purlins, rafter and trusses, | sq.m | 16.5 |
| 11 | None | Dg shed and platform at Shingkhar, | - | - |
| 12 | EW0031 | Excavation in foundation trenches or drains not exceeding 1.5m width or area 10 sq. m on plan, including dressing or ramming, disposal of surplus soil 5000m away for any lead and lifts-All kinds of soil. platform, | cu.m | 17.88 |
| 13 | CW0005 | Providing and laying in position plain cement concrete 1:3:6, 20mm nominal aggregates, excluding the cost of centering and shuttering -all work upto plinth level, | cu.m | 0.88 |
| 14 | SM0072 | Providing and laying Hand packed stone soling or filling with stones, | cu.m | 0.99 |
| 15 | CW0002 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth leve, | cu.m | 3.73 |
| 16 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete 12mm dia horizontal, | kg | 211.38 |
| 17 | EW0195 | Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, | cu.m | 1.5 |
| 18 | RC0090 | Providing and laying shuttering and centering (form work), including strutting, propping etc. and removal of form work. , | sq.m | 5.3 |
| 19 | SW0021 | Steel work riveted or bolted, in built up sections, trusses, frame-works, including cutting, hoisting, fixing and appl. priming etc, | kg | 422.27 |
| 20 | RF0001 | Providing & fixing CRIL (CGI) sheeting, including bolts, hooks and nuts 8mm dia. with bitumen and G.I limpet washers filled with white lead for connection, excluding the cost of purlins, rafter and trusses, | sq.m | 16.5 |
| 21 | None | DG shed at Pemaling,Gelephu, | - | - |
| 22 | EW0031 | Excavation in foundation trenches or drains not exceeding 1.5m width or area 10 sq. m on plan, including dressing or ramming, disposal of surplus soil 5000m away for any lead and lifts-All kinds of soil. platform, | cu.m | 17.88 |
| 23 | CW0005 | Providing and laying in position plain cement concrete 1:3:6, 20mm nominal aggregates, excluding the cost of centering and shuttering -all work upto plinth level, | cu.m | 0.88 |
| 24 | SM0072 | Providing and laying Hand packed stone soling or filling with stones, | cu.m | 0.99 |
| 25 | CW0002 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth leve, | cu.m | 3.73 |
| 26 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete 12mm dia horizontal, | kg | 211.38 |
| 27 | EW0195 | Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, | cu.m | 1.5 |
| 28 | RC0090 | Providing and laying shuttering and centering (form work), including strutting, propping etc. and removal of form work. , | sq.m | 5.3 |
| 29 | SW0021 | Steel work riveted or bolted, in built up sections, trusses, frame-works, including cutting, hoisting, fixing and appl. priming etc, | kg | 422.27 |
| 30 | RF0001 | Providing & fixing CRIL (CGI) sheeting, including bolts, hooks and nuts 8mm dia. with bitumen and G.I limpet washers filled with white lead for connection, excluding the cost of purlins, rafter and trusses, | sq.m | 16.5 |
| 31 | None | Dg shed at Khomshar,Zhemgang, | - | - |
| 32 | EW0031 | Excavation in foundation trenches or drains not exceeding 1.5m width or area 10 sq. m on plan, including dressing or ramming, disposal of surplus soil 5000m away for any lead and lifts-All kinds of soil. platform, | cu.m | 17.88 |
| 33 | CW0005 | Providing and laying in position plain cement concrete 1:3:6, 20mm nominal aggregates, excluding the cost of centering and shuttering -all work upto plinth level, | cu.m | 0.88 |
| 34 | SM0072 | Providing and laying Hand packed stone soling or filling with stones, | cu.m | 0.99 |
| 35 | CW0002 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth leve, | cu.m | 3.73 |
| 36 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete 12mm dia horizontal, | kg | 211.38 |
| 37 | EW0195 | Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, | cu.m | 1.5 |
| 38 | RC0090 | Providing and laying shuttering and centering (form work), including strutting, propping etc. and removal of form work. , | sq.m | 5.3 |
| 39 | SW0021 | Steel work riveted or bolted, in built up sections, trusses, frame-works, including cutting, hoisting, fixing and appl. priming etc, | kg | 422.27 |
| 40 | RF0001 | Providing & fixing CRIL (CGI) sheeting, including bolts, hooks and nuts 8mm dia. with bitumen and G.I limpet washers filled with white lead for connection, excluding the cost of purlins, rafter and trusses, | sq.m | 16.5 |
Amendment Details
| Sl | ID | Date | Details | Remarks |
|---|---|---|---|---|
| 1 | TAM22030020 | March 08 2022, 11:03 AM | Submission Date changed from 2022-03-02 17:00:00 to 2022-03-09 15:00:00 | Extension |
| 2 | TAM22030021 | March 08 2022, 11:03 AM | Opening Date changed from 2022-03-03 14:00:00 to 2022-03-10 14:00:00 | extension |
| 3 | TAM22030034 | March 10 2022, 02:10 PM | Submission Date changed from 2022-03-09 15:00:00 to 2022-03-16 17:00:00 | extension |
| 4 | TAM22030035 | March 10 2022, 02:10 PM | Opening Date changed from 2022-03-10 14:00:00 to 2022-03-17 14:00:00 | extension |
| 5 | TAM22030052 | March 18 2022, 08:51 AM | Submission Date changed from 2022-03-16 17:00:00 to 2022-03-23 17:00:00 | extension |
| 6 | TAM22030053 | March 18 2022, 08:51 AM | Opening Date changed from 2022-03-17 14:00:00 to 2022-03-24 14:00:00 | extension |
| 7 | TAM22030081 | March 24 2022, 02:15 PM | Submission Date changed from 2022-03-23 17:00:00 to 2022-03-30 17:00:00 | extension |
| 8 | TAM22030082 | March 24 2022, 02:16 PM | Opening Date changed from 2022-03-24 14:00:00 to 2022-03-31 14:00:00 | extension |