Construction of DG Shed and platform at Bajo counter,Lobesa and Jiligang Bhutan Telecom Ltd Contract Awarded


Procurement Category: Civil

Dzongkhag/Location: Wangdue

Goods/Services/Work Type: CON-W4-Power and Telecommunications Works (Small)

Procurement Method: Open Tendering

Annual Procurement Plan: 2022

Bidding Process: Single Stage Bidding - Single Envelope

Contact Details: sonam zangpo 17123370

Status: Contract Awarded


Bidding Details

Submission Date: May 26 2022, 04:00 PM

Opening Date: May 27 2022, 02:00 PM

Prebid Date: None

Prebid Place: None

Earnest Money Deposit Details

EMD Type: Lumpsum

EMD Value: Nu. 6,000.00/-

Evaluation Details

Financial Evaluation: 100%

Agency Documents


Sl Document Link
18 Integrity Pact Document Download
22 RFP Download
34 Bid Form Download
Document Prerequisites For Participation


Sl Document
5 Bid Form
9 CDB License
19 Integrity Pact Document
25 Tax Clearance
30 Trade License
Tender Items(BOQ/BOM)


Sl Item Code Item Name,
Additional Description/Specifications
UoM Qty
1 DG Platform
2 EW0030 Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Ordinary Soil, cu.m 2.94
3 SM0072 Providing and laying Hand packed stone filling or soling with stones, cu.m 1.47
4 CW0005 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 20 mm nominal size, cu.m 1.47
5 RC0083 Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, kg 421.32
6 RC0003 Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20 mm nominal size), cu.m 4.41
7 RC0090 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., sq.m 8.79
8 PL0021 Providing & laying 12mm cement plaster - C.M 1:4, sq.m 15.0
9 None Shed, - -
10 EW0030 Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Ordinary Soil, cu.m 1.38
11 SM0072 Providing and laying Hand packed stone filling or soling with stones, cu.m 0.3
12 CW0005 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 20 mm nominal size, cu.m 0.21
13 CW0003 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, cu.m 0.96
14 SW0011 Steel work riveted or bolted, in built up sections, trusses, frame-works, including cutting, hoisting, fixing and appl. priming coat of red lead paint - In Tees, angles and channels, kg 534.54
15 PT0055 Providing and applying finishing coats - Aluminium paint, two coats on new work, sq.m 28.18
16 RC0090 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., sq.m 12.96
17 RF0003 Providing & fixing Pre Painted Steel Corrugated Roofing sheets, including bolts, hooks and nuts 8mm dia. with bitumen and G.I limpet washers filled with white lead for connection, excluding the cost of purlins, rafter and trusses., sq.m 44.85
Amendment Details


Sl ID Date Details Remarks
1 TAM22050009 May 17 2022, 03:11 PM Opening Date changed from 2022-05-17 14:00:00 to 2022-05-27 14:00:00 extended, due to no enough bidder
2 TAM22050010 May 17 2022, 03:12 PM Submission Date changed from 2022-05-16 16:00:00 to 2022-05-26 16:00:00 Extended, due to no enough bidder