Const.of Foundation for Solar(Civil Works) at Narphung,Dungkarchoeling,Agurthang,Samrang and Samcholing. Bhutan Telecom Ltd Being processed
Procurement Category: Civil
Dzongkhag/Location: Samdrup Jongkhar
Goods/Services/Work Type: CON-W4-Power and Telecommunications Works (Small)
Procurement Method: Open Tendering
Annual Procurement Plan: 2022
Bidding Process: Single Stage Bidding - Single Envelope
Contact Details: Cheki Wangmo 17162638
Status: Being processed
Bidding Details
Submission Date: June 24 2022, 12:00 PM
Opening Date: June 24 2022, 02:30 PM
Prebid Date: None
Prebid Place: None
Earnest Money Deposit Details
EMD Type: Lumpsum
EMD Value: Nu. 6,400.00/-
Evaluation Details
Financial Evaluation: 100%
Agency Documents
| Sl | Document | Link |
|---|---|---|
| 8 | Bidding Forms | Download |
| 18 | Integrity Pact Document | Download |
| 22 | RFP | Download |
Document Prerequisites For Participation
| Sl | Document |
|---|---|
| 5 | Bid Form |
| 9 | CDB License |
| 24 | Integrity Pact Document |
| 31 | Tax Clearance |
| 36 | Trade License |
Tender Items(BOQ/BOM)
| Sl | Item Code | Item Name, Additional Description/Specifications |
UoM | Qty |
|---|---|---|---|---|
| 1 | Narphung-Solar 8 posts | |||
| 2 | EW0031 | Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, | cu.m | 12.42 |
| 3 | EW0105 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil, | cu.m | 2.3 |
| 4 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 132.48 |
| 5 | RC0002 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), | cu.m | 1.8 |
| 6 | RC0093 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., | sq.m | 19.2 |
| 7 | None | Dunkarcholeing-Solar 12 post, | - | - |
| 8 | EW0031 | Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, | cu.m | 4.32 |
| 9 | EW0105 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil, | cu.m | 3.46 |
| 10 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 198.72 |
| 11 | RC0002 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), | cu.m | 2.71 |
| 12 | RC0093 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., | sq.m | 28.8 |
| 13 | None | Agurthang-Solar 16 posts, | - | - |
| 14 | EW0031 | Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, | cu.m | 6.72 |
| 15 | EW0105 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil, | cu.m | 4.61 |
| 16 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 264.96 |
| 17 | RC0002 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), | cu.m | 3.61 |
| 18 | RC0093 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., | sq.m | 38.4 |
| 19 | None | Samrang-12 Solar Post, | - | - |
| 20 | EW0031 | Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, | cu.m | 5.04 |
| 21 | EW0105 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil, | cu.m | 3.46 |
| 22 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 198.72 |
| 23 | RC0002 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), | cu.m | 2.71 |
| 24 | RC0093 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., | sq.m | 28.8 |
| 25 | None | Samcholing-4 solar post, | - | - |
| 26 | EW0031 | Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, | cu.m | 16.2 |
| 27 | EW0105 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil, | cu.m | 1.15 |
| 28 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 66.24 |
| 29 | RC0002 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), | cu.m | 0.9 |
| 30 | RC0093 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., | sq.m | 9.6 |
Amendment Details
| Sl | ID | Date | Details | Remarks |
|---|---|---|---|---|
| 1 | TAM22060001 | June 10 2022, 02:33 PM | Submission Date changed from 2022-06-10 12:00:00 to 2022-06-17 12:00:00 | Regional Tender Committee recommended extending the tender to one week as there was only two bidders.The Submission Date shall be on 17th June,2022 before 12pm. |
| 2 | TAM22060002 | June 10 2022, 02:33 PM | Opening Date changed from 2022-06-10 14:30:00 to 2022-06-17 14:30:00 | Regional Tender Committee recommended extending the tender to one week as there was only two bidders.The opening Date shall be on 17th June,2022 at 2.30pm |
| 3 | TAM22060003 | June 17 2022, 02:36 PM | Submission Date changed from 2022-06-17 12:00:00 to 2022-06-24 12:00:00 | Regional Tender Commitee recommened to extend till one week as there was only two bidder .Last submission shall be on 24th June,before 12pm |
| 4 | TAM22060004 | June 17 2022, 02:39 PM | Opening Date changed from 2022-06-17 14:30:00 to 2022-06-24 14:30:00 | Regional Tender Committee recommended extending it to one week as there were only two bidders.The opening shall be on 24th June, at 2.30 pm in Regional Office,SJK |
