Construction of Retaining wall at Sherling Goenpa Bhutan Telecom Ltd Contract Awarded
Procurement Category: Civil
Dzongkhag/Location: Trongsa
Goods/Services/Work Type: CON-W3-Building, Irrigation, Drainage, Flood Control, Water Supply and Sewerage (Small)
Procurement Method: Open Tendering
Annual Procurement Plan: 2022
Bidding Process: Single Stage Bidding - Single Envelope
Contact Details: Tashi Wangdi 17113305
Status: Contract Awarded
Bidding Details
Submission Date: October 03 2022, 12:00 PM
Opening Date: October 03 2022, 02:30 PM
Prebid Date: None
Prebid Place: None
Earnest Money Deposit Details
EMD Type: Lumpsum
EMD Value: Nu. 14,300.00/-
Evaluation Details
Financial Evaluation: 100%
Document Prerequisites For Participation
Sl | Document |
---|---|
1 | Bid Form |
2 | Integrity Pact Document |
Tender Items(BOQ/BOM)
Sl | Item Code | Item Name, Additional Description/Specifications |
UoM | Qty |
---|---|---|---|---|
1 | construction | |||
2 | EW0031 | Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, | cu.m | 152.0 |
3 | EW0034 | Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard rock requiring chiselling (where blasting is prohibited), | cu.m | 10.0 |
4 | EW0106 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, | cu.m | 24.32 |
5 | CW0011 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:5:10 (1 cement : 5 sand : 10 graded crushed stone 40 mm nominal size), | cu.m | 3.04 |
6 | CW0003 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, | cu.m | 1.52 |
7 | SM0005 | Providing & laying Random Rubble Masonry with hard stone in foundation & plinth - In cement mortar 1:4, | cu.m | 86.45 |
8 | SM0072 | Providing and laying Hand packed stone filling or soling with stones, | cu.m | 4.28 |
Amendment Details
Sl | ID | Date | Details | Remarks |
---|---|---|---|---|
1 | TAM22090019 | September 27 2022, 08:50 AM | Submission Date changed from 2022-09-26 12:00:00 to 2022-10-03 12:00:02 | Extension |
2 | TAM22090020 | September 27 2022, 08:51 AM | Opening Date changed from 2022-09-26 14:30:00 to 2022-10-03 14:30:00 | Extension |