Construction for foundation for Tower and Fencing under Dagapela Bhutan Telecom Ltd Cancelled
Procurement Category: Civil
Dzongkhag/Location: Dagana
Goods/Services/Work Type: CON-W4-Power and Telecommunications Works (Small)
Procurement Method: Open Tendering
Annual Procurement Plan: 2023
Bidding Process: Single Stage Bidding - Single Envelope
Contact Details: Tashi Wangdi #17113305
Status: Cancelled
Bidding Details
Submission Date: September 07 2026, 12:00 AM
Opening Date: May 03 2023, 02:30 PM
Prebid Date: None
Prebid Place: None
Earnest Money Deposit Details
EMD Type: Lumpsum
EMD Value: Nu. 22,450.00/-
Evaluation Details
Financial Evaluation: 100%
Agency Documents
| Sl | Document | Link |
|---|---|---|
| 4 | Bid Data Sheet (BDS) and Special Conditions of Contract (SCC) | Download |
Document Prerequisites For Participation
| Sl | Document |
|---|---|
| 1 | Bidding Forms |
| 2 | CDB License |
| 3 | Integrity Pact Document |
| 4 | Tax Clearance |
| 5 | Trade License |
Tender Items(BOQ/BOM)
| Sl | Item Code | Item Name, Additional Description/Specifications |
UoM | Qty |
|---|---|---|---|---|
| 1 | Tower foundation (30mtrs) Susigang/ Chitradara | |||
| 2 | CG0001 | Clearing grass including removal of rubbish within 50m of site, | sq.m | 225.0 |
| 3 | CG0012 | Felling trees including cutting of trunks and branches, removal of roots, stacking of serviceable materials and disposal of rubbish within 50m lead - Girth 1200 to 2400 mm, | each | 5.0 |
| 4 | EW0031 | Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, | cu.m | 17.89 |
| 5 | EW0106 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, | cu.m | 49.2 |
| 6 | CW0009 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 50 mm nominal size), | cu.m | 1.59 |
| 7 | RC0002 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), | cu.m | 6.49 |
| 8 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 666.01 |
| 9 | RC0093 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., | sq.m | 29.7 |
| 10 | EW0195 | Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, | cu.m | 42.18 |
| 11 | None | BARBED WIRE FENCING ( 5 DECIMAL), | - | - |
| 12 | EW0105 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil, | cu.m | 2.24 |
| 13 | CW0003 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, | cu.m | 2.24 |
| 14 | SW0011 | Steel work riveted or bolted, in built up sections, trusses, frame-works, including cutting, hoisting, fixing and appl. priming coat of red lead paint - In Tees, angles and channels, | kg | 541.23 |
| 15 | RW0202 | Providing & fixing G.I barbed Wire Netting including fixing of post or struts, G.I staples, coal tarring in case of ballies complete (posts/struts, earthwork, concrete paid separately) - 2.5mm , (12 SWG), 4 barbs form by twisting two point wires, each two turns, pitch of barbs 75mm, | m | 677.75 |
| 16 | None | TOWER FOUNDATION 25MTRS (TANABJI), | - | - |
| 17 | CG0001 | Clearing grass including removal of rubbish within 50m of site, | sq.m | 225.0 |
| 18 | EW0031 | Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, | cu.m | 127.2 |
| 19 | EW0106 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, | cu.m | 49.2 |
| 20 | CW0009 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 50 mm nominal size), | cu.m | 1.59 |
| 21 | RC0002 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), | cu.m | 6.71 |
| 22 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 705.82 |
| 23 | RC0093 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., | sq.m | 29.7 |
| 24 | EW0195 | Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, | cu.m | 42.18 |
| 25 | None | RETAINING WALL (TANABJI), | - | - |
| 26 | EW0106 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, | cu.m | 6.3 |
| 27 | CW0011 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:5:10 (1 cement : 5 sand : 10 graded crushed stone 40 mm nominal size), | cu.m | 0.84 |
| 28 | CW0003 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, | cu.m | 0.32 |
| 29 | SM0005 | Providing & laying Random Rubble Masonry with hard stone in foundation & plinth - In cement mortar 1:4, | cu.m | 24.68 |
| 30 | SM0072 | Providing and laying Hand packed stone filling or soling with stones, | cu.m | 1.26 |
| 31 | RC0090 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., | sq.m | 1.1 |
| 32 | None | TOWER FOUNDATION 25MTRS ( KHEBESA), | - | - |
| 33 | CG0001 | Clearing grass including removal of rubbish within 50m of site, | sq.m | 225.0 |
| 34 | EW0031 | Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, | cu.m | 15.9 |
| 35 | EW0106 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, | cu.m | 49.2 |
| 36 | CW0009 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 50 mm nominal size), | cu.m | 1.59 |
| 37 | RC0002 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), | cu.m | 6.49 |
| 38 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 666.01 |
| 39 | RC0093 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., | sq.m | 29.7 |
| 40 | EW0195 | Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, | cu.m | 42.18 |
| 41 | None | BARBED WIRE FENCING (KHEBESA), | - | - |
| 42 | EW0105 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil, | cu.m | 0.67 |
| 43 | CW0003 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, | cu.m | 0.67 |
| 44 | SW0011 | Steel work riveted or bolted, in built up sections, trusses, frame-works, including cutting, hoisting, fixing and appl. priming coat of red lead paint - In Tees, angles and channels, | kg | 150.0 |
| 45 | RW0202 | Providing & fixing G.I barbed Wire Netting including fixing of post or struts, G.I staples, coal tarring in case of ballies complete (posts/struts, earthwork, concrete paid separately) - 2.5mm , (12 SWG), 4 barbs form by twisting two point wires, each two turns, pitch of barbs 75mm, | m | 132.44 |
Amendment Details
| Sl | ID | Date | Details | Remarks |
|---|---|---|---|---|
| 1 | TAM23040015 | April 07 2023, 03:18 PM | Submission Date changed from 2023-04-07 12:00:00 to 2023-04-14 12:00:00 | As per the decision of RTC, the tender have extended |
| 2 | TAM23040017 | April 07 2023, 03:19 PM | Opening Date changed from 2023-04-07 14:30:00 to 2023-04-14 14:30:00 | As per the decision of RTC, the tender have extended |
| 3 | TAM23040076 | April 14 2023, 07:10 PM | Submission Date changed from 2023-04-14 12:00:00 to 2023-04-21 12:00:00 | extended for 2nd time |
| 4 | TAM23040077 | April 14 2023, 07:10 PM | Opening Date changed from 2023-04-14 14:30:00 to 2023-04-21 14:30:00 | extended |
| 5 | TAM23040096 | April 24 2023, 09:00 AM | Submission Date changed from 2023-04-21 12:00:00 to 2023-05-01 12:00:00 | Extension |
| 6 | TAM23040097 | April 24 2023, 09:00 AM | Opening Date changed from 2023-04-21 14:30:00 to 2023-05-01 14:30:00 | Extension |
| 7 | TAM23040102 | April 25 2023, 03:18 PM | Submission Date changed from 2023-05-01 12:00:00 to 2023-05-03 12:00:00 | amended |
| 8 | TAM23040103 | April 25 2023, 03:19 PM | Opening Date changed from 2023-05-01 14:30:00 to 2023-05-03 14:30:00 | amended |