Realignment of fencing under Western Region Bhutan Telecom Ltd Being processed
Procurement Category: Civil
Dzongkhag/Location: Thimphu
Goods/Services/Work Type: CON-W4-Power and Telecommunications Works (Small)
Procurement Method: Limited Tendering
Annual Procurement Plan: 2023
Bidding Process: Single Stage Bidding - Single Envelope
Contact Details: Pema Wangdi (Mr.) Civil Engineering Section, Western Region, BTL. Tel: +975 2 343434 Ext. 4027 | Mob: +975 17141880| pema.wangdi2573@bt.bt Bhutan Telecom Ltd: www.bt.bt |
Status: Being processed
Bidding Details
Submission Date: September 07 2026, 12:00 AM
Opening Date: July 05 2023, 02:30 PM
Prebid Date: None
Prebid Place: None
Evaluation Details
Financial Evaluation: 100%
Agency Documents
| Sl | Document | Link |
|---|---|---|
| 1 | Bid Form | Download |
| 2 | Integrity Pact Document | Download |
| 3 | RFP | Download |
Document Prerequisites For Participation
| Sl | Document |
|---|---|
| 6 | Bid Form |
| 11 | CDB License |
| 32 | Integrity Pact Document |
| 41 | Tax Clearance |
| 53 | Trade License |
Tender Items(BOQ/BOM)
| Sl | Item Code | Item Name, Additional Description/Specifications |
UoM | Qty |
|---|---|---|---|---|
| 1 | Trashigang Goenpa | |||
| 2 | DD0056 | Dismantling fence posts, strutsT & L ironpipes & earth workdemolishing of concrete and stacking within 50m lead, | each | 32.0 |
| 3 | DD0006 | Demolishing stone rubble masonry including stacking useful materials & disposal of rubbish within 50m lead - In cement mortar, | cu.m | 18.0 |
| 4 | EW0105 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil, | cu.m | 19.69 |
| 5 | CW0003 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, | cu.m | 3.56 |
| 6 | SM0005 | Providing & laying Random Rubble Masonry with hard stone in foundation & plinth - In cement mortar 1:4, | cu.m | 3.56 |
| 7 | RC0090 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., | sq.m | 15.6 |
| 8 | SW00628 | Laying of chain lnk wire mesh fencing and fixing of angle for labour cost, | each | 1.0 |
| 9 | None | khadrapchu, | - | - |
| 10 | DD0056 | Dismantling fence posts, strutsT & L ironpipes & earth workdemolishing of concrete and stacking within 50m lead, | each | 32.0 |
| 11 | DD0055 | Dismantling barbed wire, flexible wire including making rolls & stacking within 50m lead, | kg | 176.0 |
| 12 | EW0105 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil, | cu.m | 15.75 |
| 13 | CW0003 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, | cu.m | 1.31 |
| 14 | RC0090 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., | sq.m | 16.32 |
| 15 | RW0202 | Providing & fixing G.I barbed Wire Netting including fixing of post or struts, G.I staples, coal tarring in case of ballies complete (posts/struts, earthwork, concrete paid separately) - 2.5mm , (12 SWG), 4 barbs form by twisting two point wires, each two turns, pitch of barbs 75mm, | m | 720.0 |
| 16 | SW00629 | excess material dismantle from site to be transported to CHQ store.. please quote rate for transporation and loading and unloading, | each | 1.0 |
| 17 | None | Begena, | - | - |
| 18 | DD0056 | Dismantling fence posts, strutsT & L ironpipes & earth workdemolishing of concrete and stacking within 50m lead, | each | 32.0 |
| 19 | DD0006 | Demolishing stone rubble masonry including stacking useful materials & disposal of rubbish within 50m lead - In cement mortar, | cu.m | 18.0 |
| 20 | EW0105 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil, | cu.m | 28.13 |
| 21 | CW0003 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, | cu.m | 5.0 |
| 22 | SM0005 | Providing & laying Random Rubble Masonry with hard stone in foundation & plinth - In cement mortar 1:4, | cu.m | 5.0 |
| 23 | RC0090 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., | sq.m | 30.0 |
| 24 | SW00628 | Laying of chain lnk wire mesh fencing and fixing of angle for labour cost, | each | 1.0 |
| 25 | None | Dobchu, | - | - |
| 26 | DD0056 | Dismantling fence posts, strutsT & L ironpipes & earth workdemolishing of concrete and stacking within 50m lead, | each | 28.0 |
| 27 | DD0055 | Dismantling barbed wire, flexible wire including making rolls & stacking within 50m lead, | kg | 176.0 |
| 28 | EW0105 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil, | cu.m | 15.75 |
| 29 | CW0003 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, | cu.m | 1.31 |
| 30 | RC0090 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., | sq.m | 16.32 |
| 31 | RW0202 | Providing & fixing G.I barbed Wire Netting including fixing of post or struts, G.I staples, coal tarring in case of ballies complete (posts/struts, earthwork, concrete paid separately) - 2.5mm , (12 SWG), 4 barbs form by twisting two point wires, each two turns, pitch of barbs 75mm, | m | 560.0 |
| 32 | SW00629 | excess material dismantle from site to be transported to CHQ store.. please quote rate for transporation and loading and unloading, | each | 1.0 |
| 33 | None | soegang, | - | - |
| 34 | DD0056 | Dismantling fence posts, strutsT & L ironpipes & earth workdemolishing of concrete and stacking within 50m lead, | each | 32.0 |
| 35 | DD0055 | Dismantling barbed wire, flexible wire including making rolls & stacking within 50m lead, | kg | 176.0 |
| 36 | EW0105 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil, | cu.m | 12.0 |
| 37 | CW0003 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, | cu.m | 3.0 |
| 38 | RC0090 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., | sq.m | 40.96 |
| 39 | RW0202 | Providing & fixing G.I barbed Wire Netting including fixing of post or struts, G.I staples, coal tarring in case of ballies complete (posts/struts, earthwork, concrete paid separately) - 2.5mm , (12 SWG), 4 barbs form by twisting two point wires, each two turns, pitch of barbs 75mm, | m | 960.0 |
| 40 | SW00629 | excess material dismantle from site to be transported to CHQ store.. please quote rate for transporation and loading and unloading, | each | 1.0 |
| 41 | None | Talakha, | - | - |
| 42 | DD0056 | Dismantling fence posts, strutsT & L ironpipes & earth workdemolishing of concrete and stacking within 50m lead, | each | 32.0 |
| 43 | DD0006 | Demolishing stone rubble masonry including stacking useful materials & disposal of rubbish within 50m lead - In cement mortar, | cu.m | 18.0 |
| 44 | EW0105 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil, | cu.m | 19.69 |
| 45 | CW0003 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, | cu.m | 3.56 |
| 46 | SM0005 | Providing & laying Random Rubble Masonry with hard stone in foundation & plinth - In cement mortar 1:4, | cu.m | 3.56 |
| 47 | RC0090 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., | sq.m | 15.6 |
| 48 | SW00628 | Laying of chain lnk wire mesh fencing and fixing of angle for labour cost, | each | 1.0 |