Construction of Tower foundation at Ganglapong and Monopole foundation at Namdroling Dratshang Bhutan Telecom Ltd Contract Awarded
Procurement Category: Civil
Dzongkhag/Location: Lhuentse
Goods/Services/Work Type: CON-W4-Power and Telecommunications Works (Small)
Procurement Method: Open Tendering
Annual Procurement Plan: 2024
Bidding Process: Single Stage Bidding - Single Envelope
Contact Details: Sonam Zangpo Civil Engineering Section, Eastern Region, BTL. Tel: +975 2 343434 Ext. 5003 | Mob: +975 17123370| sonam.zangpo908@bt.bt Bhutan Telecom Ltd: www.bt.bt |
Status: Contract Awarded
Bidding Details
Submission Date: April 05 2024, 12:00 PM
Opening Date: April 05 2024, 02:30 PM
Prebid Date: None
Prebid Place: None
Earnest Money Deposit Details
EMD Type: Lumpsum
EMD Value: Nu. 14,000.00/-
Evaluation Details
Financial Evaluation: 100%
Agency Documents
Sl | Document | Link |
---|---|---|
26 | Drawings | Download |
36 | Integrity Pact Document | Download |
44 | RFP | Download |
70 | Bid Form | Download |
Document Prerequisites For Participation
Sl | Document |
---|---|
6 | Bid Form |
14 | CDB License |
37 | Integrity Pact Document |
49 | Tax Clearance |
62 | Trade License |
Tender Items(BOQ/BOM)
Sl | Item Code | Item Name, Additional Description/Specifications |
UoM | Qty |
---|---|---|---|---|
1 | Tower foundation 25M at Ganglapong | |||
2 | CG0002 | Clearing jungle including uprooting of vegetation & trees of girth < 300mm & disposal within 50m of the site, | sq.m | 225.0 |
3 | EW0031 | Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, | cu.m | 150.0 |
4 | EW0106 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, | cu.m | 65.61 |
5 | EW0107 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lift - Ordinary rock with or without blasting, | cu.m | 81.0 |
6 | CW0008 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size), | cu.m | 2.48 |
7 | RC0002 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), | cu.m | 10.7 |
8 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 860.0 |
9 | RC0093 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., | sq.m | 38.93 |
10 | EW0195 | Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, | cu.m | 55.94 |
11 | None | Monopole foundation at Namdroling, | - | - |
12 | EW0031 | Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, | cu.m | 4.5 |
13 | EW0107 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lift - Ordinary rock with or without blasting, | cu.m | 36.87 |
14 | EW0106 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, | cu.m | 12.29 |
15 | CW0008 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size), | cu.m | 0.35 |
16 | RC0006 | Providing & laying in position reinforced cement concrete work in walls (any thickness) including attached pilasters buttresses, piers, abutments etc. upto floor five level excluding the cost of centering, shuttering and reinforcement - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), | cu.m | 3.48 |
17 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 483.02 |
18 | RC0093 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., | sq.m | 9.64 |
19 | EW0195 | Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, | cu.m | 9.03 |
20 | SW00647 | Providing and fixing 75mm dia PVC Pipe for water drain out, | mtrs | 4.0 |
Amendment Details
Sl | ID | Date | Details | Remarks |
---|---|---|---|---|
1 | TAM24030027 | March 29 2024, 03:03 PM | Submission Date changed from 2024-03-29 12:00:00 to 2024-04-05 12:00:00 | Extended due to no enough bidder |
2 | TAM24030028 | March 29 2024, 03:04 PM | Opening Date changed from 2024-03-29 14:30:00 to 2024-04-05 14:30:00 | Extended due to no enough bidder |