Construction of tower foundation at Rinchen zor Bhutan Telecom Ltd Contract Awarded


Procurement Category: Civil

Dzongkhag/Location: Pemagatshel

Goods/Services/Work Type: CON-W4-Power and Telecommunications Works (Small)

Procurement Method: Open Tendering

Annual Procurement Plan: 2024

Bidding Process: Single Stage Bidding - Single Envelope

Contact Details: Sonam Zangpo civil section/er/sjk 17123370

Status: Contract Awarded


Bidding Details

Submission Date: April 19 2024, 12:00 PM

Opening Date: April 19 2024, 02:30 PM

Prebid Date: None

Prebid Place: None

Earnest Money Deposit Details

EMD Type: Lumpsum

EMD Value: Nu. 10,000.00/-

Evaluation Details

Financial Evaluation: 100%

Agency Documents


Sl Document Link
36 Integrity Pact Document Download
44 RFP Download
70 Bid Form Download
Document Prerequisites For Participation


Sl Document
6 Bid Form
14 CDB License
37 Integrity Pact Document
49 Tax Clearance
62 Trade License
Tender Items(BOQ/BOM)


Sl Item Code Item Name,
Additional Description/Specifications
UoM Qty
1 Tower foundation 25M
2 EW0031 Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, cu.m 90.0
3 EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m 81.0
4 EW0107 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lift - Ordinary rock with or without blasting, cu.m 81.0
5 CW0008 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size), cu.m 2.48
6 RC0002 Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), cu.m 10.3
7 RC0083 Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, kg 817.96
8 RC0093 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., sq.m 38.93
9 EW0195 Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, cu.m 70.0
Amendment Details


Sl ID Date Details Remarks
1 TAM24040024 April 10 2024, 03:23 PM Submission Date changed from 2024-04-10 12:00:00 to 2024-04-19 12:00:00 Extended due to no enough bidder
2 TAM24040025 April 10 2024, 03:24 PM Opening Date changed from 2024-04-10 14:30:00 to 2024-04-19 14:30:00 Extension