Construction of tower foundation, solar foundation and fencing at Pakchina & Damjekha(Package 1) Bhutan Telecom Ltd Contract Awarded


Procurement Category: Civil

Dzongkhag/Location: Chukha

Goods/Services/Work Type: CON-W4-Power and Telecommunications Works (Small)

Procurement Method: Open Tendering

Annual Procurement Plan: 2024

Bidding Process: Single Stage Bidding - Single Envelope

Contact Details: Khem Raj Ghalley 17151425

Status: Contract Awarded


Bidding Details

Submission Date: April 22 2024, 12:00 PM

Opening Date: April 22 2024, 02:00 PM

Prebid Date: None

Prebid Place: None

Earnest Money Deposit Details

EMD Type: Lumpsum

EMD Value: Nu. 24,500.00/-

Evaluation Details

Financial Evaluation: 100%

Agency Documents


Sl Document Link
26 Drawings Download
36 Integrity Pact Document Download
69 Bid Form Download
70 RFP Download
Document Prerequisites For Participation


Sl Document
6 Bid Form
14 CDB License
37 Integrity Pact Document
49 Tax Clearance
62 Trade License
Tender Items(BOQ/BOM)


Sl Item Code Item Name,
Additional Description/Specifications
UoM Qty
1 Pakchina Tower Foundation(30mtr) and Cabinet
2 CG0002 Clearing jungle including uprooting of vegetation & trees of girth < 300mm & disposal within 50m of the site, sq.m 225.0
3 EW0002 Surface dressing of ground, including removal of vegetations and inequalities < 150mm deep, disposal of rubbish within 50m lead and 1.5m lifts - Hard Soil, sq.m 225.0
4 CG0010 Felling trees including cutting of trunks and branches, removal of roots, stacking of serviceable materials and disposal of rubbish within 50m lead - Girth 300 to 600mm, each 12.0
5 EW0031 Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, cu.m 341.25
6 EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m 87.67
7 EW0107 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lift - Ordinary rock with or without blasting, cu.m 87.67
8 CW0008 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size), cu.m 2.82
9 CW0003 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, cu.m 1.73
10 RC0002 Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), cu.m 13.6
11 RC0083 Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, kg 1189.38
12 RC0093 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., sq.m 47.02
13 EW0195 Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, cu.m 59.6
14 None Construction of barbed wire fencing at Pakchina, - -
15 EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m 3.6
16 CW0003 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, cu.m 2.22
17 RW0202 Providing & fixing G.I barbed Wire Netting including fixing of post or struts, G.I staples, coal tarring in case of ballies complete (posts/struts, earthwork, concrete paid separately) - 2.5mm , (12 SWG), 4 barbs form by twisting two point wires, each two turns, pitch of barbs 75mm, m 774.44
18 RW0209 Providing & fixing G.I chain-link mesh including fixing of post or struts, G.I staples (excluding the cost of posts/struts, earthwork, concrete etc.) - 4mm (8 SWG) x 50mm, sq.m 3.29
19 SW0003 Steel work in single section including cutting, hoisting, fixing and applying priming coat of red lead paint - In Tees, angles and channels, kg 510.62
20 SW0021 Steel work welded, in built up sections, trusses, frame-works including cutting, hoisting, fixing and appl. priming coat of red - In Tees, angles and channels, kg 108.67
21 RC0090 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., sq.m 22.93
22 None Damjekha Tower foundation(25 meter) and cabinet, - -
23 CG0002 Clearing jungle including uprooting of vegetation & trees of girth < 300mm & disposal within 50m of the site, sq.m 400.0
24 CG0001 Clearing grass including removal of rubbish within 50m of site, sq.m 400.0
25 EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m 76.87
26 EW0107 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lift - Ordinary rock with or without blasting, cu.m 76.87
27 CW0008 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size), cu.m 2.43
28 CW0003 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, cu.m 1.73
29 RC0002 Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), cu.m 10.3
30 RC0083 Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, kg 860.2
31 RC0093 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., sq.m 41.78
32 EW0195 Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, cu.m 63.9
33 None Construction solar foundation at Damjekha, - -
34 EW0031 Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, cu.m 108.0
35 EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m 9.54
36 CW0005 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 20 mm nominal size, cu.m 0.56
37 RC0001 Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20 mm nominal size), cu.m 2.44
38 RC0083 Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, kg 117.07
39 RC0093 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., sq.m 18.41
40 EW0195 Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, cu.m 2.3
Amendment Details


Sl ID Date Details Remarks
1 TAM24040054 April 15 2024, 03:16 PM Submission Date changed from 2024-04-15 12:00:00 to 2024-04-22 12:00:00 Time extension
2 TAM24040053 April 15 2024, 03:08 PM Opening Date changed from 2024-04-15 14:00:00 to 2024-04-22 14:00:00 There was less bidder