Construction of monopole foundation under Western Region Bhutan Telecom Ltd Contract Awarded


Procurement Category: Civil

Dzongkhag/Location: Thimphu

Goods/Services/Work Type: CON-W4-Power and Telecommunications Works (Small)

Procurement Method: Open Tendering

Annual Procurement Plan: 2024

Bidding Process: Single Stage Bidding - Single Envelope

Contact Details: Pema Wangdi (Mr.) Civil Engineering Section, Western Region, BTL. Tel: +975 2 343434 Ext. 4027 | Mob: +975 17141880| pema.wangdi2573@bt.bt Bhutan Telecom Ltd: www.bt.bt |

Status: Contract Awarded


Bidding Details

Submission Date: May 27 2024, 03:30 PM

Opening Date: May 27 2024, 03:30 PM

Prebid Date: None

Prebid Place: None

Earnest Money Deposit Details

EMD Type: Lumpsum

EMD Value: Nu. 5,000.00/-

Evaluation Details

Financial Evaluation: 100%

Agency Documents


Sl Document Link
1 Bid Form Download
2 Integrity Pact Document Download
3 RFP Download
4 Drawings Download
Document Prerequisites For Participation


Sl Document
6 Bid Form
14 CDB License
37 Integrity Pact Document
49 Tax Clearance
62 Trade License
Tender Items(BOQ/BOM)


Sl Item Code Item Name,
Additional Description/Specifications
UoM Qty
1 Construction of monopole foundation at Dranja Goenpa
2 EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m 12.29
3 CW0008 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size), cu.m 0.35
4 RC0083 Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, kg 327.0
5 RC0002 Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), cu.m 3.2
6 RC0093 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., sq.m 9.45
7 EW0195 Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, cu.m 9.03
8 None Monopole foundation at VVIP talakha, - -
9 EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m 12.29
10 CW0008 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size), cu.m 0.35
11 RC0083 Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, kg 327.0
12 RC0002 Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), cu.m 3.9
13 RC0093 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., sq.m 9.45
14 EW0195 Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, cu.m 9.03
15 None Monopole foundation at police camp punakha, - -
16 EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m 12.29
17 CW0008 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size), cu.m 0.35
18 RC0083 Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, kg 327.0
19 RC0002 Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), cu.m 3.2
20 RC0093 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., sq.m 9.45
21 EW0195 Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, cu.m 9.03
Amendment Details


Sl ID Date Details Remarks
1 TAM24040063 April 26 2024, 02:38 PM Submission Date changed from 2024-04-26 12:30:00 to 2024-05-09 12:30:00 Extension
2 TAM24040064 April 26 2024, 02:39 PM Opening Date changed from 2024-04-26 14:30:00 to 2024-05-09 14:30:00 extension
3 TAM24050006 May 09 2024, 02:39 PM Submission Date changed from 2024-05-09 12:30:00 to 2024-05-16 12:30:00 Extension
4 TAM24050007 May 09 2024, 02:42 PM Opening Date changed from 2024-05-09 14:30:00 to 2024-05-16 14:30:00 extension
5 TAM24050008 May 17 2024, 10:59 AM Submission Date changed from 2024-05-16 12:30:00 to 2024-05-27 12:30:00 extension
6 TAM24050009 May 17 2024, 10:59 AM Opening Date changed from 2024-05-16 14:30:00 to 2024-05-27 14:30:00 extension
7 TAM24050020 May 27 2024, 03:11 PM Submission Date changed from 2024-05-27 12:30:00 to 2024-05-27 15:30:00 extension
8 TAM24050021 May 27 2024, 03:12 PM Opening Date changed from 2024-05-27 14:30:00 to 2024-05-27 15:30:00 extension