Construction of monopole foundation at Laya Bhutan Telecom Ltd Contract Awarded


Procurement Category: Civil

Dzongkhag/Location: Gasa

Goods/Services/Work Type: CON-W4-Power and Telecommunications Works (Small)

Procurement Method: Limited Tendering

Annual Procurement Plan: 2024

Bidding Process: Single Stage Bidding - Single Envelope

Contact Details: Pema Wangdi (Mr.) Civil Engineering Section, Western Region, BTL. Tel: +975 2 343434 Ext. 4027 | Mob: +975 17141880| pema.wangdi2573@bt.bt Bhutan Telecom Ltd: www.bt.bt |

Status: Contract Awarded


Bidding Details

Submission Date: September 07 2026, 12:00 AM

Opening Date: April 26 2024, 02:30 PM

Prebid Date: None

Prebid Place: None

Evaluation Details

Financial Evaluation: 100%

Agency Documents


Sl Document Link
1 Bid Form Download
2 Integrity Pact Document Download
3 RFP Download
4 Drawings Download
Document Prerequisites For Participation


Sl Document
6 Bid Form
14 CDB License
37 Integrity Pact Document
49 Tax Clearance
62 Trade License
Tender Items(BOQ/BOM)


Sl Item Code Item Name,
Additional Description/Specifications
UoM Qty
1 Construction of monopole foundation at GAsa
2 EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m 12.29
3 CW0008 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size), cu.m 0.7
4 RC0002 Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), cu.m 3.2
5 RC0083 Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, kg 327.0
6 RC0093 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., sq.m 9.45
7 EW0195 Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, cu.m 9.0