Construction of Fencing, Road at Dagapela and Cable duct at Dagana Bhutan Telecom Ltd Live Participate
Procurement Category: Civil
Dzongkhag/Location: Dagana
Goods/Services/Work Type: CON-W1-Roads and Bridges (Small)
Procurement Method: Open Tendering
Annual Procurement Plan: 2025
Bidding Process: Single Stage Bidding - Single Envelope
Contact Details: Tashi Wangdi, 17113305
Status: Live
Bidding Details
Submission Date: June 09 2025, 12:00 PM
Opening Date: June 09 2025, 02:30 PM
Prebid Date: None
Prebid Place: None
Earnest Money Deposit Details
EMD Type: Lumpsum
EMD Value: Nu. 54,784.00/-
Evaluation Details
Financial Evaluation: 100%
Document Prerequisites For Participation
Sl | Document |
---|---|
1 | Bid Form |
2 | Integrity Pact Document |
Tender Items(BOQ/BOM)
Sl | Item Code | Item Name, Additional Description/Specifications |
UoM | Qty |
---|---|---|---|---|
1 | Dagapela | |||
2 | EW0031 | Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, | cu.m | 106.8 |
3 | EW0106 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, | cu.m | 56.0 |
4 | CW0011 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:5:10 (1 cement : 5 sand : 10 graded crushed stone 40 mm nominal size), | cu.m | 5.2 |
5 | DD0056 | Dismantling fence posts, strutsT & L ironpipes & earth workdemolishing of concrete and stacking within 50m lead, | each | 45.0 |
6 | DD0055 | Dismantling barbed wire, flexible wire including making rolls & stacking within 50m lead, | kg | 268.0 |
7 | SM0005 | Providing & laying Random Rubble Masonry with hard stone in foundation & plinth - In cement mortar 1:4, | cu.m | 148.0 |
8 | SM0072 | Providing and laying Hand packed stone filling or soling with stones, | cu.m | 79.0 |
9 | CW0003 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, | cu.m | 60.82 |
10 | SW0011 | Steel work riveted or bolted, in built up sections, trusses, frame-works, including cutting, hoisting, fixing and appl. priming coat of red lead paint - In Tees, angles and channels, | kg | 4118.0 |
11 | RW0209 | Providing & fixing G.I chain-link mesh including fixing of post or struts, G.I staples (excluding the cost of posts/struts, earthwork, concrete etc.) - 4mm (8 SWG) x 50mm, | sq.m | 270.0 |
12 | RC0090 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., | sq.m | 158.84 |
13 | SW0035 | Providing & fixing in position including applying a priming coat of red lead paint - Aluminum Rolling shutters, including all accessories complete but excluding top cover, | sq.m | 3.15 |
14 | SW0036 | Providing & fixing in position including applying a priming coat of red lead paint - Top cover for rolling shutters, | m | 1.5 |
15 | None | Dagana duct, | - | - |
16 | EW0155 | Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing of sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m: Ordinary rock with or without blasting - Pipes, cables etc. 80mm < dia < 300mm, | m | 20.0 |
17 | CW0003 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, | cu.m | 6.22 |
18 | RC0090 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., | sq.m | 46.08 |
19 | RC0003 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20 mm nominal size), | cu.m | 0.32 |
20 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 22.32 |
21 | PO0050 | Providing & laying H.D.P.E Pipes, 4 PN, including H.D.P.E fittings (excluding trenching, refilling & thrust block) - 110mm, | m | 48.0 |