Construction of DG Shed with platform under ER Bhutan Telecom Ltd Live Participate
Procurement Category: Civil
Dzongkhag/Location: Lhuentse
Goods/Services/Work Type: CON-W4-Power and Telecommunications Works (Small)
Procurement Method: Open Tendering
Annual Procurement Plan: 2026
Bidding Process: Single Stage Bidding - Single Envelope
Contact Details: Sonam Zangpo 17123370
Status: Live
Bidding Details
Submission Date: February 16 2026, 12:00 PM
Opening Date: February 16 2026, 02:00 PM
Prebid Date: None
Prebid Place: None
Earnest Money Deposit Details
EMD Type: Lumpsum
EMD Value: Nu. 8,000.00/-
Evaluation Details
Financial Evaluation: 100%
Agency Documents
| Sl | Document | Link |
|---|---|---|
| 37 | Drawings | Download |
| 63 | Integrity Pact Document | Download |
| 74 | RFP | Download |
| 118 | Bid Form | Download |
Document Prerequisites For Participation
| Sl | Document |
|---|---|
| 1 | Bid Form |
| 2 | CDB License |
| 3 | Integrity Pact Document |
| 4 | Tax Clearance |
| 5 | Trade License |
Tender Items(BOQ/BOM)
| Sl | Item Code | Item Name, Additional Description/Specifications |
UoM | Qty |
|---|---|---|---|---|
| 1 | DG shed with platform at Lhuentse exchange, kakaling lhuentse, Yangtse exchange, Khetshang and Tashipoktor (SJK Only shed) | |||
| 2 | DD0045 | Dismantling G.I sheets including ridges, hips, valleys, gutters & stacking materials within 50m lead, | sq.m | 53.28 |
| 3 | EW0106 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, | cu.m | 32.75 |
| 4 | SM0070 | Providing and laying Hammer dressed dry stone soling, | cu.m | 4.8 |
| 5 | CW0005 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 20 mm nominal size, | cu.m | 3.11 |
| 6 | RC0003 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20 mm nominal size), | cu.m | 10.52 |
| 7 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 479.64 |
| 8 | SW0011 | Steel work riveted or bolted, in built up sections, trusses, frame-works, including cutting, hoisting, fixing and appl. priming coat of red lead paint - In Tees, angles and channels, | kg | 853.05 |
| 9 | RF0003 | Providing & fixing Pre Painted Steel Corrugated Roofing sheets, including bolts, hooks and nuts 8mm dia. with bitumen and G.I limpet washers filled with white lead for connection, excluding the cost of purlins, rafter and trusses., | sq.m | 68.6 |
| 10 | Services00542 | providing and fixing centering and shuttering (Formwork) using shuttering plywood, including timber frame and timber strutting, propping with complete form tie system etc. and removal of form work, | sq.m | 14.4 |
| 11 | PT0055 | Providing and applying finishing coats - Aluminium paint, two coats on new work, | sq.m | 24.2 |
| 12 | DD0003 | Demolishing reinforced concrete, including stacking steel bars and disposal of rubbish within 50m lead, | cu.m | 0.54 |
| 13 | DD0001 | Demolishing cement concrete 1:3:6 & richer, including disposal of materials within 50m lead, | cu.m | 0.6 |
