Tower, Shelter and Chain Link Fencing at Gatheya, Ugyentse & Peljorling (Sibsoo) Bhutan Telecom Ltd Contract Awarded
Procurement Category: Civil
Dzongkhag/Location: Samtse
Goods/Services/Work Type: CON-W4-Power and Telecommunications Works (Small)
Procurement Method: Open Tendering
Annual Procurement Plan: 2022
Bidding Process: Single Stage Bidding - Single Envelope
Contact Details: Civil Engineer South Western Region, Phuntsholing Contact No. 343434 (Ext- 7010)/ 17113305 Email: tashi.wangdi@bt.bt
Status: Contract Awarded
Bidding Details
Submission Date: February 03 2022, 05:00 PM
Opening Date: February 04 2022, 02:00 PM
Prebid Date: None
Prebid Place: None
Earnest Money Deposit Details
EMD Type: Lumpsum
EMD Value: Nu. 21,500.00/-
Evaluation Details
Financial Evaluation: 100%
Agency Documents
Sl | Document | Link |
---|---|---|
4 | Bidding Forms | Download |
12 | Integrity Pact Document | Download |
16 | RFP | Download |
Document Prerequisites For Participation
Sl | Document |
---|---|
2 | Bid Form |
6 | CDB License |
15 | Integrity Pact Document |
21 | Tax Clearance |
24 | Trade License |
Tender Items(BOQ/BOM)
Sl | Item Code | Item Name, Additional Description/Specifications |
UoM | Qty |
---|---|---|---|---|
1 | Tower foundation works at Gatheya, Samtse | |||
2 | CG0002 | Clearing jungle including uprooting of vegetation & trees of girth < 300mm & disposal within 50m of the site, | sq.m | 400.0 |
3 | CG0011 | Felling trees including cutting of trunks and branches, removal of roots, stacking of serviceable materials and disposal of rubbish within 50m lead - Girth 600 to 1200mm, | each | 10.0 |
4 | EW0031 | Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, | cu.m | 96.25 |
5 | EW0106 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, | cu.m | 49.2 |
6 | CW0009 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 50 mm nominal size), | cu.m | 1.93 |
7 | RC0002 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), | cu.m | 6.7 |
8 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 753.32 |
9 | RC0093 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., | sq.m | 32.88 |
10 | EW0195 | Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, | cu.m | 41.21 |
11 | EW0106 | EARTH PIT (1.00x1.00x1.5)mtrs 2 nos, | cu.m | 3.0 |
12 | Shelter foundation works at Gatheya, Samtse, | - | - | |
13 | EW0106 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, | cu.m | 17.64 |
14 | CW0009 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 50 mm nominal size), | cu.m | 0.82 |
15 | RC0002 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), | cu.m | 3.17 |
16 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 289.11 |
17 | RC0093 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., | sq.m | 20.16 |
18 | EW0195 | Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, | cu.m | 7.64 |
19 | Chain Link fencing works at Gatheya, Samtse, | - | - | |
20 | EW0105 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Ordinary Soil, | cu.m | 11.7 |
21 | CW0003 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, | cu.m | 4.14 |
22 | SM0007 | Providing & laying Random Rubble Masonry with hard stone in foundation & plinth - In cement mortar 1:6, | cu.m | 13.1 |
23 | SW0011 | Steel work riveted or bolted, in built up sections, trusses, frame-works, including cutting, hoisting, fixing and appl. priming coat of red lead paint - In Tees, angles and channels, | kg | 928.52 |
24 | RW0209 | Providing & fixing G.I chain-link mesh including fixing of post or struts, G.I staples (excluding the cost of posts/struts, earthwork, concrete etc.) - 4mm (8 SWG) x 50mm, | sq.m | 100.8 |
25 | SW0021 | Steel work welded, in built up sections, trusses, frame-works including cutting, hoisting, fixing and appl. priming coat of red - In Tees, angles and channels, | kg | 134.57 |
26 | CW0011 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:5:10 (1 cement : 5 sand : 10 graded crushed stone 40 mm nominal size), | cu.m | 2.4 |
27 | RC0003 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20 mm nominal size), | cu.m | 0.89 |
28 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 40.69 |
29 | RC0090 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., | sq.m | 25.94 |
30 | PT0055 | Providing and applying finishing coats - Aluminium paint, two coats on new work, | sq.m | 26.86 |
31 | Shelter foundation works at Ugyentse, Samtse, | - | - | |
32 | EW0106 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, | cu.m | 17.64 |
33 | CW0009 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 50 mm nominal size), | cu.m | 0.82 |
34 | RC0002 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), | cu.m | 3.17 |
35 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 289.11 |
36 | RC0093 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., | sq.m | 20.16 |
37 | EW0195 | Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, | cu.m | 7.64 |
38 | Monopole Tower foundation works at Peljorling, Sibsoo, | - | - | |
39 | EW0106 | Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, | cu.m | 12.0 |
40 | CW0009 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 50 mm nominal size), | cu.m | 0.35 |
41 | RC0002 | Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), | cu.m | 3.2 |
42 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 326.11 |
43 | RC0093 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., | sq.m | 9.45 |
44 | EW0195 | Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, | cu.m | 9.03 |
Amendment Details
Sl | ID | Date | Details | Remarks |
---|---|---|---|---|
1 | TAM22010035 | January 31 2022, 02:12 PM | Tender Items(BOQ/BOM) changed from None to None | Amended due to mistake in BOQ |
2 | TAM22010035 | January 31 2022, 02:12 PM | RC0083, Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete changed from 7.53 to 753.32 | Amended due to mistake in BOQ |