Monopole Tower Foundation works under Thimphu Bhutan Telecom Ltd Contract Awarded
Procurement Category: Civil
Dzongkhag/Location: Thimphu
Goods/Services/Work Type: CON-W4-Power and Telecommunications Works (Small)
Procurement Method: Open Tendering
Annual Procurement Plan: 2022
Bidding Process: Single Stage Bidding - Single Envelope
Contact Details: Civil Engineer Western Region Contact No: 343434 (Ext –4027) Email: sonam.zangpo908@bt.bt
Status: Contract Awarded
Bidding Details
Submission Date: February 15 2022, 05:00 PM
Opening Date: February 16 2022, 02:00 PM
Prebid Date: None
Prebid Place: None
Earnest Money Deposit Details
EMD Type: Lumpsum
EMD Value: Nu. 6,000.00/-
Evaluation Details
Financial Evaluation: 100%
Agency Documents
Sl | Document | Link |
---|---|---|
12 | Integrity Pact Document | Download |
21 | Bid Form | Download |
Document Prerequisites For Participation
Sl | Document |
---|---|
2 | Bid Form |
6 | CDB License |
15 | Integrity Pact Document |
21 | Tax Clearance |
24 | Trade License |
Tender Items(BOQ/BOM)
Sl | Item Code | Item Name, Additional Description/Specifications |
UoM | Qty |
---|---|---|---|---|
1 | MONOPOLE TOWER FOUNDATION WORKS AT LANGJOPHAKHA, TTI CAMPUS WANGCHU TABA, YESIPANG, WANGBAMA CENTRAL SCHOOL & CHAMGANG GEWOG OFFICE | |||
2 | EW0030 | Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Ordinary Soil, | cu.m | 61.45 |
3 | CW0008 | Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size), | cu.m | 1.75 |
4 | RC0083 | Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, | kg | 1394.1 |
5 | RC0010 | Providing & laying in position reinforced cement concrete work in plinth and skirting courses, fillets, columns , pillars, posts and struts upto floor five level excluding the cost of centering, shuttering and reinforcement - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), | cu.m | 17.4 |
6 | RC0090 | Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., | sq.m | 50.85 |
7 | EW0195 | Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, | cu.m | 44.1 |