Construction of 1.30 km Forest Road at Khotokha FMU and major maintenance of stringer bridge Natural Resource Development Corporation Limited Being processed


Procurement Category: Civil

Dzongkhag/Location: Wangdue

Goods/Services/Work Type: CON-W1-Roads and Bridges (Small)

Procurement Method: Open Tendering

Annual Procurement Plan: 2024

Bidding Process: Single Stage Bidding - Single Envelope

Contact Details: Civil Engineer Engineering and Mechanical Service Section Forest Resources Division 17940403 bishal.subba@nrdcl.bt

Status: Being processed


Bidding Details

Submission Date: April 06 2024, 05:00 PM

Opening Date: April 08 2024, 02:30 PM

Prebid Date: None

Prebid Place: None

Earnest Money Deposit Details

EMD Type: Lumpsum

EMD Value: Nu. 64,085.00/-

Evaluation Details

Financial Evaluation: 100%

Minimum Technical Score Required: 70.0

Agency Documents


Sl Document Link
1 Standard Bidding Document Download
2 General Conditions of Contract (GCC) Download
3 Integrity Pact Document Download
4 Bid Submission Form Download
5 Drawings Download
6 Bill of Quantities Download
7 Specifications of Geo-Textile Filter Fabric Download
8 Bid Data Sheet (BDS) and Special Conditions of Contract (SCC) Download
9 User manual to upload EMD Download
Document Prerequisites For Participation


Sl Document
1 Bid Submission Form
2 CDB License
3 Integrity Pact Document
4 Tax Clearance
5 Trade License
Tender Items(BOQ/BOM)


Sl Item Code Item Name,
Additional Description/Specifications
UoM Qty
1 CG0002 Clearing jungle including up-rooting of vegetation and felling of trees of girth greater than 300mm & disposal within 50m of the site., sq.m 13000.0
2 RW0013 Excavation of road formation/trace/box cutting, with excavator including separate deposition of soil, rock sand stones within 50m for reuse over the distance of 2000m exact, irrespective of the station marking in the field. Disposed earth/rock to be leveled and neatly dressed. In general the formation width required is 5m. However, the formation width at Zigs, Sharp ridges & valleys will be more than 5m. The width of cutting should be as per the instruction of the site supervisor. Excavation in all types of soil, cu.m 8221.1
3 RW0014 Excavation of road formation/trace/box cutting, with excavator including separate deposition of soil, rock sand stones within 50m for reuse over the distance of 2000m exact, irrespective of the station marking in the field. Disposed earth/rock to be leveled and neatly dressed. In general the formation width required is 5m. However, the formation width at Zigs, Sharp ridges & valleys will be more than 5m. The width of cutting should be as per the instruction of the site supervisor. Excavation of rock with or without blasting, cu.m 218.0
4 RW0120 Providing and laying Hammer dressed stone edging 150 x 250 mm with stones including excavation, refilling and disposal of surplus earth within 30 m lead, m 2600.0
5 SM0072 Providing and laying Hand packed stone filling or soling with stones, cu.m 655.5
6 EW0096 Providing and laying earth or borrow materials in layers including dressing and leveling in embankments for road shoulder within 50m lead., cu.m 97.5
7 RW0107 Construction of 600mm width x 500mm depth V-Shaped earthen side drain including excavation, levelling and disposing of excavated surplus earth/rock within 50m lead and making trenches in marshy areas., m 1300.0
8 RW0123 Binding of road & passing places surface by spreading and leveling the local good quality soil excavated within 50m lead and compacting with road roller of 8 - 10 ton, sq.m 4370.0
9 Consumables00002 Providing and laying non-woven geo-textile filter fabric (3m x 1300m) placed throughout the road and covering with soil for atleast 50mm. The Geotextile should be as per the standard provided in SBRW 2023, sq.m 3900.0
10 NRDCL-stringer-bridge00004 Buying Spruce sill logs (conifer class 'B'), Cft 412.74
11 NRDCL-stringer-bridge00006 Loading, unloading & Transportation. Loading, unloading & Transportation of sill logs to work site by hiring truck, Cft 412.74
12 NRDCL-stringer-bridge00007 Loading, unloading & Transportation of sawn timber to work site by hiring truck, Cft 364.13
13 NRDCL-stringer-bridge00008 Dismantling of the old bridge. dismantling of the old stringer bridge using back hoe/excavator (marching = 2 hours, dismantling = 1 hour), Hour 3.0
14 NRDCL-stringer-bridge00003 Log placing. Hiring of excavator for placing the sill logs as bridge over the RRM abutments including the cost of laborers.,
please provide the rate inclusive of labourers
Hour 48.0
15 NRDCL-stringer-bridge00009 Supply and installation of sawn timber for deck and wheel track. , Cft 364.13
16 NRDCL-stringer-bridge00010 Fixing decking and wheel track with nails or spike or iron clamp by hiring a Gd.1 carpenter, Man-Day 2.0
17 NRDCL-stringer-bridge00011 Nails and spike. supply of wire nails or spike for fastening the decking to the stringers., kg 50.0
Amendment Details


Sl ID Date Details Remarks
1 TAM24030007 March 04 2024, 02:11 PM EMD Value changed from 155466 to 115466 EMD value mistaken
2 TAM24030012 March 20 2024, 01:15 PM Opening Date changed from 2024-03-20 12:41:04 to 2024-03-20 14:30:43 mistake opening time
3 TAM24030013 March 20 2024, 01:38 PM Submission Date changed from 2024-03-19 12:41:04 to 2024-03-20 14:30:24 Mistake in submission time
4 TAM24030014 March 20 2024, 01:39 PM Submission Date changed from 2024-03-20 14:30:24 to 2024-03-20 14:30:00 Mistake in Submission Date